CivicCause
Sign in
Weekly email: the clearest signal on local decisions.
Get the Weekly Brief
Santa Clara County Meetings

Santa Clara Valley Water District Board (Valley Water)

regional • 2026-03-24 • 11:00 AM
HistoricalLast updated: Apr 24, 2026, 11:02 PM
Agenda + causes
Back to county meetings
Participate in this Meeting
Attend in Person
Date
Tuesday, March 24
Time
11:00 AM
Location
Location details not available
Join Virtually
Zoom meeting link detected
Phone
calling (408) 630-2277
(408) 630-2277
View Full Agenda
Comment on Agenda Items
Public comment is usually tied to a specific agenda item. Review the agenda below, choose the item you want to speak or write about, and follow the meeting's comment instructions.
Public comment instructions were found in the agenda. Comments may need to reference a specific agenda item.
clerkoftheboard@valleywater.org
AI-assisted drafting for specific agenda items will be available soon.
Meeting sourceView agenda
Meeting summary not available
This meeting does not yet have a reliable summary. You can review the agenda, packet, or video to see what was discussed.
AgendaPacket
Agenda
View agenda
Tip: public comments are usually connected to a specific agenda item. Choose the item first, then prepare your comment.
Reconstructed agenda items • Rebuilt from agenda text because source-provided agenda items were unavailable.
1
Roll Call. 1.1. 11:00 AM CLOSED SESSION:
Reconstructed
10
CEO and Chiefs' Report. 10.1.
Reconstructed
ADMINISTRATION:
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
11
March 24, 2026 Page 6 of 7 7
Reconstructed
DISTRICT COUNSEL:
12
BOARD POLICY PLANNING CALENDAR/PROPOSED FUTURE BOARD AGENDA ITEMS:
Reconstructed
12.05
Liquidated Damages, if the Pre- Construction Conference does not occur within this time frame due to late submission of the required documentation by the Contractor.
Reconstructed
13
Review the Fiscal Year 2026 Board Policy Planning Calendar. 13.1.
Reconstructed
BOARD MEMBER REPORTS/ANNOUNCEMENTS:
14
CLERK REVIEW AND CLARIFICATION OF BOARD REQUESTS:
Reconstructed
15
ADJOURN:
Reconstructed
16
The Board will convene for the next Regular meeting at 1:00 p.m. on Tuesday, April 14, 2026, in the Santa Clara Valley Water District Headquarters Building Boardroom, 5700 Almaden Expressway, San Jose, California, and via Zoom
Reconstructed
teleconference.
16.1
March 24, 2026 Page 7 of 7 8
Reconstructed
Recommendation: Consider the January 2026 Board Advisory Agricultural Water Advisory Committee, Environmental and Water Resources Committee, and Santa Clara Valley Water Commission’s recommendations to approve the Board Advisory Committ...
Santa Clara Valley Water District File No.: 26-0296 Agenda Date: 3/24/2026 Item No.: 2.1. NON-EXHIBIT/CLOSED SESSION ITEM SUBJECT : ..Title CLOSED SESSION PUBLIC EMPLOYEE APPOINTMENT Pursuant to Government Code Section 54957(b)(1) Title: Chief Executive Office...
17
Bidder’s Security.
Reconstructed
A. Each Proposal must be submitted electronically through PlanetBids and accompanied by a Bidder’s Bond in the sum of not less than 10 percent of the total aggregate of the Proposal including all additive and Supplemental Bid items, if any. B. Bids shall be pr...
18
Contract Retention.
Reconstructed
A. ☐ The Contract Retention for this Project is established at five (5) percent of the Contract Price. 89 Notice to Bidders Page 9 of 10 01/28/2026 C0727 – PENITENCIA DELIVERY AND FORCE MAIN INSPECTION AND REHABILITATION PROJECT B. ☒ The Contract Retention for...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
19
Substitution of Securities.
Reconstructed
The Contractor may, at the Contractor’s request and expense, substitute securities equivalent to the amount withheld by Valley Water to ensure the performance of the contract, in accordance with Public Contract Code §22300.
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
2
Water Supply – Goal: Provide a reliable, safe, and affordable water supply for current and future generations in all communities served.
Reconstructed
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
20
Small Business Preference.
Reconstructed
Valley Water has elected to implement the small business preference provisions of Public Contract Code §2002(a)(1). For purposes of Valley Water’s program, a small business is as defined in Government Code §14837. See http://www.valleywater.org/construction to...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
2022
A Project Labor Agreement is a multi-union pre-hire agreement that governs wages, benefits, work rules, and other terms and conditions of employment at a construction site.
Reconstructed
The PLA is an agency- wide agreement applicable to all Covered Projects as defined in the PLA, Article 1 Definitions. 1.7, Covered Project. B. A copy of the executed PLA is in the Contract Documents in Appendix A, Project Labor Agreement.
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
2025
Valley Water’s OPEB Trust Fund continues to perform well.
Reconstructed
The investment return for FY 25 was 12.3%, which surpassed the targeted 6%. The status on OPEB’s unfunded liability will be presented by Valley Water Chief Financial Officer, Darin Taylor. The OPEB Unfunded Liability PowerPoint presentation will be distributed...
2026
January 5 Committee Elects Chair and Vice Chair for 2026.
Reconstructed
(Action) Accomplished January 5, 2026 The Committee unanimously approved Vice Chairperson Trevor Garrod as Chairperson. The Committee unanimously approved Tim Chiala as Vice Chairperson. 2 Annual Accomplishments Report. January 5 Review and approve 2025 Accomp...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
2040
Subsidence repairs to the SWP are estimated to cost about $3 billion over 20 years.
Reconstructed
Without this investment, subsidence damage will lead to higher costs and risks to California ratepayers who are already struggling with multiple affordability issues. The Sacramento-San Joaquin River Delta, which provides the state’s main supply of water, cons...
2050
April 7 July 7 Accomplished April 7, 2025: The Committee received and noted the information, provided feedback, and took no formal action.
Reconstructed
Accomplished July 7, 2025: The Committee received and noted the information, provided feedback, and took no formal action. 5 Receive Update on One Water Plan Upper Pajaro Watershed Plan Priority Actions. January 6 Accomplished January 6, 2025: The Committee re...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
2051
Pros · The creation of the working group allows for a thorough, collaborative process. · This targeted, collaborative approach, if successful, would serve as a model for others to follow.
Reconstructed
Recommendation: Support and Amend Priority Recommendation: 2 The Sacramento-San Joaquin River Delta and the State Water Project (SWP) together make up Santa Clara Valley Water District Printed on 3/13/2026 Page 2 of 7 powered by Legista...
Cons · The creation of a working group, rather than legislation with direct statutory reform, could delay the implementation of needed changes. · The targeted focus on coastal resilience projects on the California coast and San Francisco Bay fails to address s...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
21
Rights of Way .
Reconstructed
This Project will be constructed within Valley Water’s existing rights-of-way.
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
22
Permits .
Reconstructed
The Contractor will be required to obtain permits from the City of SAN JOSE for use of the public right away for hauling and traffic control. See Contract Documents, Special Provisions, Section
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
23
Escrow Bid Documents.
Reconstructed
A. Escrow Bid Documents must be submitted by the Bidders submitting the three apparent low Bids. The Escrow Bid Documents must be submitted in a sealed container, separate from the Bidder’s Bid proposal, no later than 5 p.m. on the third business day following...
24
Equal Opportunity.
Reconstructed
Valley Water is an equal opportunity employer, and all Contractors of Valley Water are to have and follow a policy of equal opportunity including adherence to all state and federal laws and regulations, including the Federal Equal Opportunity Clause. By order...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
3
Pledge of Allegiance/National Anthem. 3.1.
Reconstructed
Recommendation: Wendy Ho, 408-630-3874 Manager: Attachment 1: 2026 Work Plan, AWAC Attachment 2: 2026 Work Plan, EWRC Attachment 3: 2026 Work Plan, SCVWC Attachments: Est. Staff Time: 10 Minutes Receive an Update on the Status of Santa...
Orders of the Day. 3.2. A. Approximate Discussion Time (Board); and March 24, 2026 Page 2 of 7 3 B. Adjustments to the Order of Agenda Items. Time Open for Public Comment on any Item not on the Agenda. 3.3. Notice to the public: Members of the public who wish...
4
Environmental Stewardship – Goal: Sustain ecosystem health while managing local water resources for flood protection and water supply.
Reconstructed
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
5
Adopt a Resolution Authorizing Conveyance of a Real Property Interest to the Santa Clara Valley Transportation Authority (VTA) for the Bay Area Rapid Transit Silicon Valley Berryessa Extension Project; Authorize the Interim Chief Executive
Reconstructed
Recommendation: March 24, 2026 Page 5 of 7 6 AUTHORITY AS OWNER OF APN 092-07-010 PURSUANT TO SECTION 31(g) OF THE DISTRICT ACT (SAN JOSE, DISTRICT 3); B. Authorize the Interim CEO to execute a Quitclaim Deed (9433-3.1) conveying a Real...
Officer to Execute the Quitclaim Deed and the Agreement to Acquire Easement Interests, and to Accept an Assignment of Utility and Ingress/Egress Easements (Milpitas, District 3). 26-0262 5.1. A. Adopt the Resolution DECLARING THAT A REAL PROPERTY INTEREST (EAS...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
6
WATERSHEDS:
Reconstructed
7
Approve the Budget Adjustment in the Amount of $15,000,000 to the Fiscal Year 2026 Budget for the Upper Llagas Creek Flood Protection Project, Phase 2B, Project No. 26174055 (Morgan Hill, District 1). 26-0266 7.1.
Reconstructed
Recommendation: Bhavani Yerraptou, 408-630-2735 Manager: ASSISTANT CHIEF EXECUTIVE OFFICER:
Approve the budget adjustment in the amount of $15,000,000 to the Fiscal Year 2026 Budget for the Upper Llagas Creek Flood Protection Project, Phase 2B.
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
8
EXTERNAL AFFAIRS:
Reconstructed
9
CHIEF EXECUTIVE OFFICER:
Reconstructed
1.a
Completely drain and remove all water from the Penitencia Force Main, Penitencia Delivery Main pipelines.
Reconstructed
Completely drain and remove all water from the South Bay Aqueduct pipeline from the SBA Terminal Tank at Penitencia Water Treatment Plant to the CPL/SBA Line Valve Vault. Treated water shall be dechlorinated before its release to storm drains or local water bo...
1.b
Perform work on the treated and raw water transmission pipeline appurtenances.
Reconstructed
See the Pipeline Maintenance Tables on G sheets 83 Notice to Bidders Page 3 of 10 01/28/2026 C0727 – PENITENCIA DELIVERY AND FORCE MAIN INSPECTION AND REHABILITATION PROJECT of the Project Drawings for the appurtenance work to be completed at each site.
C
Adopt the plans and specifications and authorize
Reconstructed
Recommendation: March 24, 2026 Page 4 of 7 5 advertisement for bids for Construction of the Penitencia Delivery and Force Main Inspection and Rehabilitation Project, per the Notice to Bidders; and
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
D
Authorize the Designated Engineer to issue addenda, as necessary, during the bidding process.
Reconstructed
Emmanuel Aryee, 408-630-3074 Manager: Attachment 1: Notice to Bidders Attachment 2: Project Delivery Process Chart Attachment 3: Map Attachments: Adopt Recommended Positions on State Legislation: AB 2051 (Wicks) Public Resources: Coastal Resilience Permitting...
Public comment item
AI-assisted comment drafting for this agenda item will be available soon.
1.e
Perform internal pipeline repair work as specified and as needed should deteriorated pipe sections be identified during the internal pipeline visual and electromagnetic inspection, including, but not limited to magnetic flux, weko seals,
Reconstructed
weld repairs, CFRP, and mortar repairs.
1.f
Prepare and coat all in-vault and exposed pipeline appurtenances and associated piping assembly components.
Reconstructed
1.g
Prepare, coat and waterproof at all existing vault interior walls.
Reconstructed
Waterproof the interior and exterior walls of cast-in-place and precast vaults.
1.h
Install electrical conduits, enclosures, lights, and panels as shown on the Drawings.
Reconstructed
I
Coordinate and install supervisory control and data acquisition (SCADA) system components.
Reconstructed
1.j
Furnish, install, and test all cathodic protection systems and associated components.
Reconstructed
1.k
Furnish and install vault hatches, manholes, ladders, vent hole screens and corrosion control test stations.
Reconstructed
L
Remove and reinstall hatch panels at Grossmont Vault, End of ERDIP Access Vault, the Clearwell Bypass Vault, and remove and reinstall the roof at the CPL/SBA Line Valve Vault, the MPL/PDM Line Valve Vault, and the CPL/PFM Line Valve Vault
Reconstructed
to facilitate work.
M
Brown Act.
Reconstructed
To maximize public safety while maintaining transparency and public access, members of the public have the option to participate via teleconference/video conference or attend in person. To participate in the meeting via teleconference/video conference, please...
1.n
Replace gaskets and hardware on existing nozzles and blind flanges.
Reconstructed
1.o
Procure, stage, and install appurtenance components including, but not limited to, valves, flanges, pipe joints, and utility boxes. 84
Reconstructed
Notice to Bidders Page 4 of 10 01/28/2026 C0727 – PENITENCIA DELIVERY AND FORCE MAIN INSPECTION AND REHABILITATION PROJECT
1.p
Contractor must field measure for the valve and appurtenance installation and submit platform modification details for approval.
Reconstructed
The cost for platform modification shall be included as incidental work.
1.q
Remove and replace ARV vent piping where shown on the Drawings.
Reconstructed
1.r
Provide logistical support for pipeline flushing and disinfection efforts at discharge locations on Penitencia Delivery Main.
Reconstructed
Support from the contractor includes but is not limited to the transportation and delivery of disinfection material and equipment. Contractor to provide traffic control for disinfection, as needed.
1.s
Restore all impacted work sites to a condition equal to or better than that existing prior to construction.
Reconstructed
1.t
Install one new nozzle on existing welded steel pipe with bar reinforcement where shown on the Drawings.
Reconstructed
The scope of Work is comprised of 15 Milestones: